Bridge Cleaning and Maintenance Underway Until Mid-July
Jun 27, 2016 | 4:18 PM
LETHBRIDGE – City crews will be cleaning and maintaining bridge structures along Lethbridge roadways over the next two weeks.
Work is scheduled between 5-am and 3-pm on weekdays until July 12. Lane closures in either direction will occur on an alternating basis, but two-way traffic will be largely maintained throughout.
These areas are included:
– University Drive (Whoop-Up Driver overpass)