Bike Boulevard to be extended, but drivers still adjusting
LETHBRIDGE – The city will present plans to extend the 7 Avenue S. Bike Boulevard at the official grand opening of the corridor.
The project, constructed during the 2017 season, converted the route between 4 Street S. and Mayor Magrath Drive to a shared bicycle and vehicle corridor with a reduced speed limit. By the end of this year, it will cross Scenic Drive at 4 Street S. to connect to the regional pathway.
Along the bike boulevard, some intersections were converted to mini-roundabouts, while “directional diverters” were installed at two others. Those diverters force vehicle traffic on 7 Avenue to make a right turn onto the side street while allowing bicycles through. Northbound and southbound traffic at those intersections must stop, then turn left onto 7 Avenue.