Premier cites feds in explanation for moratorium on new wind and solar projects
EDMONTON, AB – Alberta Premier Danielle Smith says Ottawa is one of the reasons why her government has placed a moratorium on approving new wind and solar power projects, arguing the feds are preventing the development of backup generation for renewable energy like natural gas.
Smith, whose government surprised the province’s renewable energy industry last week by announcing a six-month freeze on new projects greater than one megawatt, told her provincewide radio call-in program Saturday that backup plants powered by natural gas are needed for when wind isn’t blowing or the sun isn’t shining.
But, she said, the federal government doesn’t want Alberta to add any new natural gas electricity plants to the grid.
“So I’ve told them, how can I bring on additional wind and solar if I’m not able to secure the reliability of my power grid by being able to bring on natural gas peaker plants? That’s the heart of the problem,” Smith said.