Funding approved for electrical planning study in Lethbridge
LETHBRIDGE, AB – Lethbridge City Council has approved funding for an electrical planning study.
On Tuesday, September 13, 2022, council voted unanimously to approve one-time funding of $500,000 from the Electric Reserve to complete the Chinook Trail Functional Planning Study in 2023.
Two transmission paths are to be proposed and evaluated, as per requirements by the Alberta Utility Commission (AUC). The City of Lethbridge noted that there is already an approved Transmission Right of Way along Métis Trail. The second proposal would be within the future Chinook Trail corridor.
The study is required to make an informed decision and develop a proper design and estimate the cost of building. Officials said that the study is required in 2023 to meet approval and construction timelines.