Stay informed with the LNN Daily Newsletter

Month-long Electrical Construction for Heritage Heights Area

Mar 15, 2016 | 10:28 AM

LETHBRIDGE – A month’s worth of work begins today (Tuesday, March 15) for City of Lethbridge crews replacing an underground high voltage main feeder line on the west side.

Construction will be along the pathway that connects Heritage and Edgewood Boulevard.

The path will remain open over the next month. Residents are asked to use extreme caution and obey all posted signs and barricades in the area.

Access to the tunnel between Father Leonard Van Tighem School and the Heritage and Ridgewood Heights area will remain open open as well.